Geothermal Heat Pump Installation in Bel Air, MD 21014

“Ground Loop just completed a geothermal installation in our home. From start to finish we could not be more pleased. Ted Evans came out to our home and explained the system and installation process. He then examined the site, measured the house and presented us the quote. All of our many questions were answered at that time. After the wells were drilled Ground Loop began their installation which took approximately 2 days as promised. All of their employees were very knowledgeable, professional, and respectfully. They were very detail oriented, and the final outcome reflects that. The county inspectors were on site the other day. During the inspection on of them commented to me that he was not just glossing over the inspection. He takes the inspection very seriously, but he knows from experience that when he is coming out to look at an installation by Ground Loop, he’s not going to have a problem. Things will be done right.
Highly Recommended”

– Chuck D.